SOC 2 Type II attestedCNCF 428/428 conformantSee the evidence

Qlarity

One number for every cloud dollar. Scored by written rules.

The share of every dollar doing justified work. The same evidence and rules give the same score, to the cent.⁠[1]

  • Patent pending⁠[2]
  • Open to dispute
  • 4 rule families

    Every avoidable dollar in exactly one.

  • 2 bases

    Never combined into one number.

  • 90¢ the line

    Of every dollar, doing justified work.

Every dollar lands in one place. Then the score is one division.

The September 2026 bill

Cents of each dollar · dollars a month

  • Justified work66¢$40,941
  • Cost avoidance34¢$20,906
  • Oversized capacity11¢$6,627
  • Pricing and scheduling18¢$11,154
  • Idle services4¢$2,661
  • Data transfer1¢$464

The bill100¢$61,847

The score

Justified$40,941divided by Bill$61,847times 100equals 66.2

Every avoidable dollar carries the rule that classified it.

Two bases, never combined. Only the price reference changes.

In-PlaceThe headline

  1. Your bill, where it runs
  2. The written rules
  3. Priced at your own provider

NexQloud never counted

NexQloud basisShown second

  1. The same bill
  2. The same rules
  3. Priced at NexQloud

Labelled

A blended headline would move with NexQloud's own prices.

A person confirms every line. And any line can be disputed.

  1. Proposed

    Software may propose a classification.

  2. Confirmed

    It enters the score only once a named person confirms it, logged with who and when.

  3. Disputed

    You name the line by its rule ID and evidence reference.

  4. Settled

    Only by the evidence, or a corrected requirements statement you sign. A new result; the original stays on record.

Where the score stops. The rest is your call.

MeasuresMonth by month

  • The justified shareOf whatever the bill is.
  • Dated figuresEvery dollar with the month it was measured.

Leaves to you

  • Architecture quality
  • Reliability or security posture
  • Sustainability
  • The cost of re-engineering
  • Whether a workload should exist

The rules describe how cost avoidance is measured. They are not a promise about any future bill.

What Qlarity™ shows today
Status as of October 30, 2026
CapabilityStatus
The cost assessment, read-only, for one accountAvailable⁠[3]
Measurement of your monthly cloud spendAvailable⁠[4]
The Qlarity ScoreAvailable

Findings rest on past use and cannot see your plans, so each is one an operator approves.

A FinOps Foundation guide to pitfalls tells of a pilot where most tool recommendations were not actionable, per the engineering teams.⁠[5]

Get your own score. Free, for one account.

See pricing

The assessment never asks for write permissions.

  1. FirstBook

    A person replies.

  2. ThenConnect, read-only

    A role from our template.⁠[6]

  3. ThenYour score

    Within 24 hours.⁠[7]

  4. ThenA call on the report

    Your team decides what to act on.

Questions on the Score.

8 answers

All Qlarity questions

Trust

Can I trust a score from the company that sells the tool?

You can check each number: every finding shows its method, its date window and what it was measured against. The headline score never counts NexQloud; NexQloud is priced only on a second basis, and labelled. A dispute names a classification by its rule ID and evidence.

Does Qlarity promise savings?

No. The rules describe how cost avoidance is measured; they are not a promise about any future bill. If the assessment can't show $2 of cost avoidance for every $1 Qlarity costs, Qlarity isn't a fit.⁠[8] Identified cost avoidance depends on your own decisions and on the provider's prices.

The score

How is the Qlarity Score worked out?

Score = justified spend ÷ total spend × 100, by written rules. Justified spend is spend no rule claims as avoidable. Cost avoidance is spend a written rule shows could be removed without losing needed work.

What is a good score?

An account at 90 or above meets the line: ninety cents of every dollar doing justified work. The grades: A 90 and above, B 80 to 89, C 65 to 79, D 50 to 64, F under 50. Bands are fixed and published, never relative to other companies. A: efficient, within prudent headroom. B: minor cost avoidance, routine hygiene. C: material cost avoidance, warrants review. D: significant cost avoidance. F: most of the bill is not doing justified work. The grade is read from the Score as published, so the letter always matches the number shown.

What evidence does a score rest on?

The standard is read-only access to the cloud account: billing, full inventory, utilization telemetry and service activity. A requirements statement your engineers sign, or continuous collection, adds to it. Without account access, a documentary variant reads the billing export and infrastructure definitions, at lower precision, always disclosed. Every result states its evidence level.

How is cost avoidance different from savings?

Cost avoidance is spend a written rule shows could be removed without losing needed work. A saving is a fall you measure against a past bill, such as a discount from your cloud.

How is a score rounded?

Once, to one decimal place, half-up. Line amounts are computed in fixed decimals and rounded to the cent, half-up, once per line.

Does Qlarity show how well my discount commitments are used?

No. Commitment coverage is not computed today.⁠[9]

Often used withThe assessmentAccess and securityFor government